St. Croix River Crossing: Highway 95 Switches to Single Lane as Construction Ramps Up

unnamed (3)

Highway 95 switched to single-lane traffic in each direction at the Highway 36 today, March 21.

The lane closures are necessary for crews to resume transporting segments across the road for Minnesota approach bridge deck construction, according to a MnDOT news release. The lane closures will continue through the construction season.

unnamed (4)

Photo illustration courtesy of MnDOT.

MnDOT hopes the St. Croix River Crossing will open to traffic in Fall 2017. The original completion date for the river crossing was late-November 2016.

 

unnamed (5)

Photo illustration courtesy of MnDOT.

St. Croix River Crossing in the News:

Aerial Photos from March 7, 2016

Check out these five aerial photos of the St. Croix River Crossing taken on March 7 by Mike Demulling:

Screen Shot 2016-03-20 at 11.15.11 PM

Screen Shot 2016-03-20 at 11.14.59 PM

Screen Shot 2016-03-20 at 11.14.46 PM

Screen Shot 2016-03-20 at 11.14.33 PM

Screen Shot 2016-03-20 at 11.19.17 PM

Want more local stuff?

Stillwater Current is on a mission to spread local news. 

If you like what you see, try our daily email.